# MaxMine case studies: results from open pit mines

**Quick answer:** MaxMine publishes eleven case studies from open pit mines, each with a headline result, how it was measured and its limits. Results include +3 tons per load at NRW's Karara project (named), +8% average payload, -16% queue time, +14.7% haul speed and -84% ramp overspeed events. Every figure is one site's reported result, not a guarantee.

## What results has MaxMine delivered at open pit mines?

| Site type | Problem | Headline result (basis) | Module | Case study |
|---|---|---|---|---|
| Iron ore mine, NRW at Karara (named) | Cutting emissions and lifting efficiency | +3 tons per load, 612,000 extra tons a year without additional costs (3 tons x about 17,000 loads a month x 12; period not stated) | IMPACT Load and Haul Performance, Operator Performance | [NRW at Karara](/case-studies/nrw-mining-maxmine-a-partnership-driving-efficiency-and-decarbonisation.md) |
| Gold mine, Western Australia, multinational operator | Payload variation, below-target average payload, overloads | +8% average payload (as reported; period not stated) | IMPACT Operator Performance, Load and Haul Performance | [Gold mine payload optimisation](/case-studies/optimizing-payloads.md) |
| Open pit client (not named) | Queuing the fleet management system could not show | -16% queue time with the same total hauls; $240,000 annualised savings (first 35 days, annualised) | CORE, IMPACT Load and Haul Performance | [Custom dashboard to reduce queue time](/case-studies/custom-dashboard-to-reduce-queue-time.md) |
| Open pit mine (not named) | Rough haul roads limiting speed | Safe speed limit +10 km/h; haul speed +14.7% (34.6 to 39.7 km/h; live page says 16.5%), return +18.2% (period not stated) | IMPACT Roads and Ancillaries | [Haul road condition](/case-studies/haul-road-condition.md) |
| Large open pit gold mine, 180 and 220 t trucks | Low tyre life, high tyre cost per tonne | -75% tyre spend (site's own cost, period not stated) | IMPACT Operator Performance, Safety | [Gold mine tyre life improvement](/case-studies/gold-mine-tyre-life-improvement.md) |
| Large open pit gold and copper mine | Wide variation between operator haul speeds | +12% sustained average full haul speed (held 6 months after target) | IMPACT Operator Performance | [Reducing cycle times by improving operator productivity](/case-studies/reducing-cycle-times-by-improving-operator-productivity.md) |
| Gold mine, Western Australia | Trucks exceeding decline ramp speed limits | -84% average daily overspeed ramp events (456 to 52 events, four weeks before vs after) | IMPACT Safety | [Supporting supervisors to ensure ramp safety](/case-studies/supporting-supervisors-to-ensure-ramp-safety.md) |
| Mine with Cat 785C trucks | Unexplained loss of steering, fleet below full capacity | Truck at 23 km/h on the corner, 8 km/h above average; no further steering issues after corner speed leagues (cause not proven) | IMPACT Safety, Operator Performance | [Analysis and support for safety investigation](/case-studies/analysis-support-for-safety-investigation.md) |
| Mine with Cat 793 trucks | Stall and rollback with no fault codes | Root cause (loose ECU wire) found within 24 hours of notification | IMPACT Safety, Equipment Health | [Data driven safety and incident investigation](/case-studies/data-driven-safety-and-incident-investigation.md) |
| Large open pit coal mine | Frame damage, downtime, wrong payloads from overcharged struts | +12% machine availability; -91% daily suspension alerts (as reported; period not stated) | IMPACT Equipment Health | [Focus on suspension to improve availability](/case-studies/focus-on-suspension-to-improve-availability.md) |
| Tier 1 mining site | One truck 1.8 km/h slower uphill after maintenance | Incorrectly flashed ECU found and fixed by the next shift | IMPACT Equipment Health | [Fixing an under-performing truck of 2 years](/case-studies/fixing-an-under-performing-truck-of-2-years.md) |

## More results from MaxMine sites (sites not named)

MaxMine names a site only where the customer has agreed to be named. These results are described by commodity, mining method and country. Each is a before and after at one site, seen while the site used MaxMine; none is a promise at another mine.

| Descriptor | Result | Window | Caveat |
|---|---|---|---|
| **Load and Haul: queue** | | | |
| A Tier 1 open-cut coal mine in South Africa | Queue time per load at the digger 4.97 to 3.10 min (-38%), all load units; truck-hours queuing a day 68 to 46, about 1.3 trucks at 17 engine-on hours | January to September 2026 | Against June 2025 the fall is about 28%; cause not confirmed as MaxMine action alone |
| An Australian hard-rock lithium mine | Queue time per load 4.5 to 3.5 min (-23%) while trucks per loader rose from 3.4 to 4.1; about 4,400 truck-hours a year | April to September 2024 vs May to October 2026 | Fleet changed over the period |
| A Tier 1 open-cut coal mine in South Africa (installed Tier 1 FMS) | The installed FMS recorded about 43% of the queue time MaxMine measured at the same loading units | February 2026 review | Shows how much queue a button or radius method misses |
| **Load and Haul: idle** | | | |
| A Tier 1 open-cut coal mine in South Africa | Haul truck idle 42% to 36.7% of engine-on; idle 184 to 147 h a day; queue idle 88 to 46-50 h a day (-43%) | January to October 2026 | Total idle fell less than queue idle |
| An Australian contractor-run gold mine | Haul truck idle 38.4% to 22.1% of engine-on (-42%); queueing about 15% to 5-7%; about 13,700 engine-on hours a year, about two trucks | 2018-19 vs 2024 | Long period; a step change in queueing in 2021 is not explained |
| An Australian hard-rock lithium mine | Dozer idle 42-44% to 26-30% of engine-on (about a third less) | 2024 vs 2026 | Mixed-work dozers |
| A Tier 1 open-cut coal mine in South Africa | Ancillary idle of engine-on: graders 29% to 7%, water carts 41% to 8%, production dozers 41% to 19% | January 2026 vs late June to August 2026 | Cost figures not published |
| **Load and Haul: payload** | | | |
| An Australian contractor-run coking coal mine | Underloaded trips (under 90% of target) 48.8% to 23.6% (-52%); about 31,200 fewer truck trips a year | July to December 2025 vs May to October 2026 | One truck model; the before window is a low point |
| An Australian open-cut metallurgical coal mine | Underloaded trips 28.8% to 13.3% (-54%); about 10,100 fewer trips a year | October 2023 to March 2024 vs February to July 2026 | One truck model |
| An Australian hard-rock lithium mine | Underloaded trips 37.9% to 22.9% (-40%); about 5,700 fewer trips a year | April to September 2024 vs May to October 2026 | One truck model |
| An Australian contractor-run coking coal mine | Underloaded trips 23.4% to 11.8% (-50%) in the first year; about 13,200 fewer trips a year | February to April 2019 vs July to December 2019 | First-year result |
| An Australian contractor-run gold mine | Average payload 211 to 235 t against a 227 t target (+11.6%); +9.8% on the full-year 2019 baseline; held above target for more than three years | January to June 2019 vs the six months to March 2025 | Long period, other changes possible |
| An open-pit mine (site not named) | Average payload 203 to 215 to 223 t against a 227 t target (+10%); loads under target 76% to 52% | 14 months | None stated |
| A Tier 1 open-cut coal mine in South Africa | Payload 93% to a sustained 101% of target | April 2024 to a sustained level from June 2025 | None stated |
| A Tier 1 open-cut coal mine in South Africa | Weighbridge check trips stopped once MaxMine payload and strut health were validated: about 3.6 productive truck-hours a day | April to July 2024 | None stated |
| A large Australian open-pit gold mine | Payload +3.9%, sustained for 13 months; overload rate -86% | Manned-fleet era (before autonomy) | Older result |
| **Operators and Safety** | | | |
| An Australian contractor-run coking coal mine | Loaded downhill runs above 25 km/h 54.7% to 9.0% (-84%); about 3,600 fewer a month | January to June 2024 vs May to October 2026 | Measured against a fixed 25 km/h; the site's posted limit changed |
| An Australian hard-rock lithium mine | Corners taken more than 5 km/h over the posted limit 11.7% to 3.3% (-72%); about 1,370 fewer a day | April to September 2024 vs May to October 2026 | None stated |
| An Australian open-cut thermal coal mine | Loaded downhill runs above 25 km/h 22.3% to 8.4% (-62%); about 5,300 fewer a month | 2024 vs May to October 2026 | Fixed 25 km/h |
| An Australian open-cut coal mine | Loaded downhill runs above 25 km/h 32.8% to 7.8% (-76%), even after the posted limit went up; about 2,800 fewer a month | January to June 2023 vs May to October 2026 | Fixed 25 km/h |
| An Australian open-cut metallurgical coal mine | Corners above 30 km/h 8.9% to 2.6% (-71%); about 1,040 fewer a day | April 2023 to March 2024 vs May to October 2026 | Fixed 30 km/h |
| A hard-rock iron ore open pit, 14 haul trucks (220 t class) | Loaded corner passes over the limit 21.1% to 12.6%; well over 3.6% to 1.0%; 32 of 38 operators improved; hours per tyre about 4,800 to just over 6,000 (+25%); the tyre supplier's own review found +20% with no change of tyre | 2025 vs 2026 to date | Roads and tyre rotations also contributed; crept back since May 2026 |
| An Australian contractor-run coking coal mine | On a 515 m loaded flat, the gap between slow and fast operators 21.8 to 8.2 s (-62%); slowest 10% of passes 28.9 to 36.7 km/h (+27%) | October to November 2023 vs July to August 2024 | One road section |
| A hard-rock iron ore open pit | 27 of 30 operators improved Haul Efficiency (median 81.6 to 88.9); time lost against best practice -52%; about 6 truck-hours a day back | December 2022 to January 2023 vs August to November 2023 | None stated |
| **Roads** | | | |
| An open-pit gold mine in West Africa | Rough and extremely rough road 34% to 17% of measured road; haul road condition score about 32 to 65 | January to April vs July to October 2023 | No speed or tonnes result (not checked) |
| **MAXI** | | | |
| An Australian hard-rock lithium mine | MAXI traced a load carrying a lost ground-engaging tool to its dump in 3 minutes (question 11:58, report in the shift notes 12:01), work that takes about 30 minutes, and a few hours elapsed, by hand | July 2026 | The manual time is MaxMine's estimate |
| An Australian open-cut coal mine | First MAXI site trial: 25 users and 167 sessions in four days | June 2026 | Usage, not an outcome |

## How does MaxMine measure results?

MaxMine measures results from data recorded by the MaxMine unit on each machine, so payload, time and speed come from the machine and not from keyed entries. A result is a change in a measured number at a site, such as average payload, queue minutes, haul speed or alerts per day. Each case study says what was measured, over what period where one is given, and where the result has limits. Most pages show a percentage change and not the before and after values, and most do not state a period.

Results come from one site each. They depend on the fleet, the site's own changes in the period and how the site used MaxMine, so they are not a guaranteed outcome at another mine. MaxMine's headline figures elsewhere on this site are described as case study improvement potential for the same reason.

## Which case studies are about safety?

Three: [ramp overspeed events](/case-studies/supporting-supervisors-to-ensure-ramp-safety.md), [a Cat 785C loss of steering](/case-studies/analysis-support-for-safety-investigation.md) and [a Cat 793 stall and rollback](/case-studies/data-driven-safety-and-incident-investigation.md). All map to the MaxMine IMPACT Safety module.

## Which case studies are about tonnes and productivity?

[Payload optimisation](/case-studies/optimizing-payloads.md), [NRW at Karara](/case-studies/nrw-mining-maxmine-a-partnership-driving-efficiency-and-decarbonisation.md), [queue time](/case-studies/custom-dashboard-to-reduce-queue-time.md), [haul road condition](/case-studies/haul-road-condition.md) and [operator haul speed](/case-studies/reducing-cycle-times-by-improving-operator-productivity.md).

## Frequently asked questions

**Are the results guaranteed at another mine?**
No. Each result comes from one site and depends on its fleet, its other changes in the period and how it used MaxMine.

**Why do most case studies show a percentage and not before and after values?**
That is how the sites reported them. Where a page gives no baseline or period, it says so under "Limits of the result".

**Which case studies name the customer?**
One: NRW Civil & Mining at the Karara Iron Ore project. The other ten sites are not named.

**Which case study covers tyre life?**
The [gold mine tyre life case study](/case-studies/gold-mine-tyre-life-improvement.md) reports -75% tyre spend, and the [tyre life guide](/guides/haul-truck-tyre-life.md) explains how corner speed is measured.

## Related

- [MaxMine CORE](/solution/core.md)
- [MaxMine IMPACT](/solution/impact.md)
- [Payload optimisation](/solution/payload-optimisation.md)
- [How to extend haul truck tyre life](/guides/haul-truck-tyre-life.md)
- [How to reduce haul truck queue time](/guides/haul-truck-queue-time.md)
- [How to improve haul truck payload](/guides/haul-truck-payload.md)
- [Haul road condition monitoring](/guides/haul-road-condition-monitoring.md)
- [How to reduce haul truck idle time](/guides/haul-truck-idle-time.md)