title: "Custom dashboard to reduce queue time: 16% less queue time, same hauls"
url: https://maxmine.com.au/case-studies/custom-dashboard-to-reduce-queue-time/
canonical: https://maxmine.com.au/case-studies/custom-dashboard-to-reduce-queue-time/
description: "A MaxMine client cut overall queue time by 16% with the same number of hauls, an annualised saving of $240,000, after queue data and coaching replaced manually changed delay codes."
page_type: case-study
product: IMPACT
author: ""
updated: 2026-11-04
last_reviewed: 2026-11-04
status: v2-draft
faq: true
site_type: "Open pit mining operation (client not named)"
customer_named: false
headline_result: "16% reduction in overall queue time with total hauls unchanged; $240,000 annualised savings"
period: "Savings measured over the first 35 days after implementation; annualised"
modules: [ "CORE", "IMPACT Load and Haul Performance" ]
---

# Custom dashboard to reduce queue time

**Quick answer:** At an open pit client where the fleet management system could not show queuing, MaxMine measured it from truck movement and paired automatic dashboards with coaching. Overall queue time fell 16% with the same total hauls. The client reported $240,000 in annualised savings, based on the first 35 days. Client not named.

**Key results**

- **Overall queue time: -16%,** with total hauls unchanged, so the fall did not come from moving fewer loads.
- **$240,000 annualised savings:** $240,000 saved in the first 35 days after implementation, as reported in the MaxMine case study.
- **Queue time measured by MaxMine from truck movement,** not from delay codes entered by people.

## What was the site's problem?

The client was over its budgeted engine hours and short of target tonnes hauled. People in the field saw trucks queuing, but the fleet management system data did not show it. Management suspected dispatch operators were changing delay codes (queuing) to standby codes (waiting by the shovel), which made queue time look smaller in the reported figures.

## What changed?

- MaxMine automatically distributed customised dashboards to all stakeholders, so the size of the queuing problem was visible to everyone.
- MaxMine coaches worked with the client on how queue time is managed in normal operations.
- The coaches reviewed and updated the standby and delay codes, which improved how the fleet management system allocates trucks.
- The dispatch team was trained to manage queue times during the shift, so the change would last.

Queue time was measured by MaxMine from truck movement data, not from codes entered by people. The client therefore had one set of checked data for queue time, and the opportunity to change codes to improve a KPI no longer affected the reported figures.

## Results

| Metric | Before | After | Change | Basis |
|---|---|---|---|---|
| Overall queue time | Not stated | Not stated | -16% | Total number of hauls unchanged |
| Savings | n/a | n/a | $240,000 annualised | $240,000 saved in the first 35 days after implementation, as reported in the MaxMine case study |

## How was it measured?

The 16% is the change in overall queue time with the same total number of hauls, so the reduction did not come from moving fewer loads. The page does not state the baseline queue minutes, the comparison window or how the dollar saving was calculated.

## Limits of the result

- No absolute queue times or comparison periods are given, only the percentage.
- The dollar figure has no stated currency or cost basis. The "annualised" figure is based on the first 35 days.
- Dashboards, coaching, code changes and dispatch training were introduced together. The page does not separate their effects.
- The client is not named and no site type is given beyond an open pit operation.

## Which MaxMine products were used?

- MaxMine CORE: queue detection from truck movement at the face, and the queuing picket chart.
- MaxMine IMPACT Load and Haul Performance module: queue and loading time reports.
- MaxMine services: coaches and training for the dispatch team.

## Frequently asked questions

**How does MaxMine measure queue time?**
MaxMine measures queue time from truck movement data, so changing a delay code to a standby code no longer changes the reported figure.

**Did the 16% come from hauling fewer loads?**
No. The case study states total hauls were unchanged, so the same loads were moved with less queuing.

**What did the site do besides use dashboards?**
MaxMine coaches reviewed and updated the standby and delay codes and trained the dispatch team to manage queue time during the shift. The page does not separate the effect of each step.

**Is $240,000 a measured annual saving?**
It is annualised. The case study reports $240,000 saved in the first 35 days and gives no currency or cost basis.

## Related

- [MaxMine CORE](/solution/core.md)
- [IMPACT Load and Haul Performance](/solution/load-and-haul-performance.md)
- [Idle and queue time](/solution/idle-time-optimisation.md)
- [Reducing cycle times by improving operator productivity](/case-studies/reducing-cycle-times-by-improving-operator-productivity.md)
- [How to reduce haul truck queue time](/guides/haul-truck-queue-time.md)
- [All case studies](/case-studies/index.md)

## Contact

Talk to MaxMine: https://maxmine.com.au/contact/

*Updated 4 November 2026 by.*