title: "NRW Mining and MaxMine at Karara: 612,000 extra tons a year without additional costs"
url: https://maxmine.com.au/case-studies/nrw-mining-maxmine-a-partnership-driving-efficiency-and-decarbonisation/
canonical: https://maxmine.com.au/case-studies/nrw-mining-maxmine-a-partnership-driving-efficiency-and-decarbonisation/
description: "NRW Civil & Mining used MaxMine at the Karara Iron Ore project to lift average fill factor by 3 tons a load, an extra 612,000 tons a year with no extra cost, plus fuel, tyre and CO2 savings."
page_type: case-study
product: IMPACT
author: ""
updated: 2026-11-04
last_reviewed: 2026-11-04
status: v2-draft
faq: true
site_type: "Iron ore mine, Karara Iron Ore project, operated by NRW Civil & Mining"
customer_named: true
headline_result: "Fill factor +3 tons per load; about 17,000 loads a month; 612,000 extra tons a year without additional costs"
period: "not stated"
modules: [ "IMPACT Load and Haul Performance", "IMPACT Operator Performance" ]
---

# NRW Mining and MaxMine: a partnership driving efficiency and decarbonisation

**Quick answer:** NRW Civil & Mining, at the Karara Iron Ore project, uses MaxMine to optimise payloads, haul speeds and idling. NRW reports an average fill factor gain of 3 tons per load. At about 17,000 loads a month that is 612,000 extra tons a year without additional costs. This is a named customer case.

**Key results**

- **Average fill factor: +3 tons per load,** as reported in the MaxMine case study.
- **About 17,000 loads a month,** so +612,000 tons a year: 3 tons x 17,000 loads x 12 months, without additional costs.
- **Overall score: 76% to 96% (+20 points)** after NRW set expectations and coached crews.
- **Fuel, tyre and CO2 savings** reported, with no figures given.

## Who is the customer?

NRW Civil & Mining operates at the Karara Iron Ore project. NRW set out to reduce greenhouse gases and wanted a technology-driven way to use data. This is a named customer case.

## What changed?

MaxMine provided operator and fleet data that NRW used to optimise payloads, maximise haul speeds, minimise idling and more. NRW had a number of custom reports built to help run the mine. Superintendents and supervisors review the reports at shift change meetings and check the leagues for compliance, and non-conformances are taken up with crews at prestart meetings. NRW also tracks crusher throughput, its major contractual KPI, with reports sent automatically to key stakeholders and reviewed at daily production meetings.

NRW's Brendan Shamrock said: "MaxMine has become part of our daily operation. We have had a number of custom reports developed to assist us with running the mine. Superintendents and supervisors review the reports at shift change meetings and review the leagues to ensure compliance. Non-conformances are addressed with crews at prestart meetings. We also monitor the crusher throughput as our major contractual KPI, and reports are automatically distributed to key stakeholders. Custom reports are also review at daily production meetings."

## Results

| Metric | Before | After | Change | Basis |
|---|---|---|---|---|
| Average fill factor | Not stated | Not stated | +3 tons per load | As reported in the MaxMine case study |
| Loads per month | About 17,000 | n/a | n/a | As reported |
| Extra material moved | n/a | n/a | +612,000 tons a year | 3 tons x about 17,000 loads x 12 months, without additional costs |
| Overall score | 76% baseline | 96% | +20 points | NRW: "By setting expectations and coaching our crews" |
| Fuel, tyres, CO2 | Not stated | Not stated | Savings, no figures | As reported |

## How was it measured?

The extra tonnage is arithmetic: the average fill factor gain per load multiplied by monthly loads over 12 months. It is not a separately measured total. The page does not define the overall score or its period.

## Limits of the result

- No period is given, and the results are NRW's reported figures.
- The 612,000 tons is a calculation from a per-load gain, and assumes loads stay at about 17,000 a month.
- "Without additional costs" is NRW's wording. The page gives no fuel, tyre or CO2 numbers.
- The overall score is not defined, and the page shows two different baselines (79% in the graphic, 76% in the text).

## Which MaxMine products were used?

- MaxMine IMPACT Load and Haul Performance module: payload and fill factor, haul speeds, idling, custom reports.
- MaxMine IMPACT Operator Performance module: leagues reviewed at shift change and prestart.

## Frequently asked questions

**How was the 612,000 tons calculated?**
It is arithmetic: the 3 ton per load gain multiplied by about 17,000 loads a month over 12 months. It is not a separately measured total and assumes loads stay at that rate.

**How does NRW use MaxMine day to day?**
Superintendents and supervisors review reports and leagues at shift change meetings, and non-conformances are taken up with crews at prestart. NRW also tracks crusher throughput, its major contractual KPI, with reports sent automatically.

**Is NRW named?**
Yes. NRW Civil & Mining at the Karara Iron Ore project is the named customer in this case study.

**Are there fuel, tyre and CO2 numbers?**
Not on this page. NRW reports savings but the case study gives no figures.

## Related

- [IMPACT Load and Haul Performance](/solution/load-and-haul-performance.md)
- [IMPACT Operator Performance](/solution/operation-behaviour.md)
- [Payload optimisation](/solution/payload-optimisation.md)
- [Gold mine payload optimisation](/case-studies/optimizing-payloads.md)
- [How to improve haul truck payload](/guides/haul-truck-payload.md)
- [How to reduce haul truck idle time](/guides/haul-truck-idle-time.md)
- [How to extend haul truck tyre life](/guides/haul-truck-tyre-life.md)
- [All case studies](/case-studies/index.md)

## Contact

Talk to MaxMine: https://maxmine.com.au/contact/

*Updated 4 November 2026 by.*