title: "Supporting supervisors to ensure ramp safety: 84% fewer overspeed ramp events"
url: https://maxmine.com.au/case-studies/supporting-supervisors-to-ensure-ramp-safety/
canonical: https://maxmine.com.au/case-studies/supporting-supervisors-to-ensure-ramp-safety/
description: "A Western Australian gold mine used MaxMine near-live ramp overspeed emails to supervisors, cutting average daily overspeed ramp events by 84%, from 456 events in four weeks to 52."
page_type: case-study
product: IMPACT
author: ""
updated: 2026-11-04
last_reviewed: 2026-11-04
status: v2-draft
faq: true
site_type: "Gold mine, Western Australia (not named)"
customer_named: false
headline_result: "84% reduction in average daily overspeed ramp events; 456 events in four weeks down to 52"
period: "Four weeks before and four weeks after reporting started (eight-week window)"
modules: [ "IMPACT Safety" ]
---

# Supporting supervisors to ensure ramp safety

**Quick answer:** A Western Australian gold mine used MaxMine near-live emails to supervisors when a haul truck broke a ramp speed limit. Overspeed ramp events fell from 456 in the four weeks before reporting to 52 in the four weeks after. The case study reports an 84% reduction in average daily events. Site not named.

**Key results**

- **Average daily overspeed ramp events: -84%** as reported. Totals fell from 456 to 52 over the eight-week window.
- **11 days, 39% of days, with no overspeed ramp events** after reporting started.
- **Loaded ramp speeding improved first,** leaving empty-truck overspeed as the next focus.
- **Events flagged on a near-live basis,** about 30 minutes, with no human input.

## What was the problem?

Site management was worried about haul trucks exceeding speed limits on decline ramps. It is a critical safety issue, made more pressing by a recent fatality at another Western Australian mine. The site's fleet management system had gaps, so the site had no accurate, easy way to flag and track overspeed events, loaded and empty, in real time. It needed an automatic notification that supervisors could act on within the shift, free of human input.

## What did MaxMine do?

MaxMine built an automated overspeed monitoring and notification service on its live datasets:

- MaxMine classified every ramp speed event against the site's own gear and speed rules, on a near-live (about 30 minute) basis, with no human input.
- Implementation coaches helped the site build a push notification. When a ramp speeding event occurs, an email goes to the site supervisor with the truck ID, time and location of the event.
- Supervisors speak with the truck operator at the next break, so the issue is dealt with before it can lead to a worse outcome.

The project needed implementation and change management support from site leadership.

## Results

| Metric | Before | After | Change | Basis |
|---|---|---|---|---|
| Ramp overspeed events | 456 in the 4 weeks before reporting | 52 in the 4 weeks after | -84% in average daily events | Eight-week window |
| Days with no overspeed ramp events | Not stated | 11 days, 39% of days | n/a | After reporting started |
| Loaded ramp speeding | Not stated | Greatest immediate improvement | Not stated | As reported |

Some operators who often triggered overspeed alerts went to no alerts after the project went live. The page's reading is that given trusted data, operators self-regulate. Loaded ramp speeding improved first, which left empty-truck overspeed as the next focus.

An Operations Superintendent at the mine said: "With MaxMine Safety, high potential ramp speeding non-conformance can be identified and addressed in a timely manner, before they lead to potential adverse outcomes." He also said the biggest value was "the constant communication back and forward to tailor solutions to our needs and the quick turnaround to make changes or improvements."

## How was it measured?

Events are identified from machine data and counted against the site's gear and speed rules, with a delay of about 30 minutes. The comparison is the four weeks before supervisors started receiving reports against the four weeks after.

## Limits of the result

- The window is eight weeks, so the page cannot show whether the improvement lasted longer.
- The 84% is for average daily events and does not match the 456 to 52 totals exactly. The page does not explain the difference.
- Nothing is said about other changes in the period, such as speed limit changes, road work or toolbox talks.
- The result covers overspeed events, not injuries or incidents.
- The site is not named.

## Which MaxMine products were used?

- MaxMine IMPACT Safety module: decline ramp and speed zone events, and daily alerts to supervisors.

## Frequently asked questions

**How do supervisors find out about an overspeed event?**
MaxMine classifies each ramp speed event against the site's gear and speed rules about every 30 minutes, then emails the supervisor the truck ID, time and location.

**What happens after the email?**
The supervisor speaks with the truck operator at the next break, so the issue is dealt with before it can lead to a worse outcome.

**Does the result show fewer incidents?**
No. It covers overspeed events only, over an eight-week window, and does not report injuries or incidents.

**Why do 84% and 456 to 52 not match?**
The 84% is for average daily events and 456 to 52 is a total over four weeks each side. The case study does not explain the difference.

## Related

- [IMPACT Safety](/solution/safety.md)
- [IMPACT Operator Performance](/solution/operation-behaviour.md)
- [Analysis and support for safety investigation](/case-studies/analysis-support-for-safety-investigation.md)
- [All case studies](/case-studies/index.md)

## Contact

Talk to MaxMine: https://maxmine.com.au/contact/