title: "MaxMine haul truck payload: measure every load, fix underloading, keep strut data accurate"
url: https://maxmine.com.au/solution/payload-optimisation/
canonical: https://maxmine.com.au/solution/payload-optimisation/
description: "MaxMine measures payload on every haul from the truck's strut pressure, independent of the onboard system, and gives operators and supervisors feedback to hit the right load."
page_type: module
product: IMPACT
modules: ["IMPACT Load and Haul Performance", "IMPACT Operator Performance", "IMPACT Equipment Health"]
author: ""
updated: 2026-11-04
last_reviewed: 2026-11-04
status: v2-draft
faq: true
---

# MaxMine payload: measure every haul and close the gap to target

**Quick answer:** MaxMine measures payload on every haul from the truck's strut pressure, independent of the truck's onboard system, and turns it into feedback that helps operators hit the right load. At NRW Mining's Karara project, fill factor rose about 3 t per load, about 612,000 extra tonnes a year, as reported in the MaxMine case study.

**Key results**

- **Fill factor up about 3 t a load, about 612,000 t a year; overall score 76% to 96%.** NRW Mining at the Karara Iron Ore project, as reported in the MaxMine case study; period not stated.
- **Underloaded trips (under 90% of target) 48.8% to 23.6% (-52%).** An Australian contractor-run coking coal mine, Jul to Dec 2025 vs May to Oct 2026. One truck model; the before window is a low point.
- **Underloaded trips 28.8% to 13.3% (-54%).** An Australian open-cut metallurgical coal mine, Oct 2023 to Mar 2024 vs Feb to Jul 2026. One truck model.
- **Average payload 211 to 235 t against a 227 t target (+11.6%).** An Australian contractor-run gold mine, Jan to Jun 2019 vs the six months to Mar 2025. Long period, other changes possible.
- **Average payload 203 to 215 to 223 t against a 227 t target (+10%); loads under target 76% to 52%.** An open-pit mine (site not named), 14 months.
- **Payload +3.9%, sustained for 13 months; overload rate -86%.** A large Australian open-pit gold mine, Manned-fleet era (before autonomy). Older result.

## Why do trucks run under or over target payload?

- **Loading varies by operator and load unit,** and without per-load data nobody sees the spread.
- **Targets are set once** and do not follow truck class or material.
- **Payload readings can be wrong.** Worn or miscalibrated struts silently corrupt them, and weighbridge checks and payload studies are slow, costly and disrupt operations.

## How does MaxMine measure payload?

1. **The MaxMine unit on each truck reads strut pressure and deflection** and calculates payload per haul, every cycle, with MaxMine's own algorithm, independent of the truck's onboard OEM system.
2. **Each load is linked** to its load unit and material through [CORE](/solution/core.md).
3. **Feedback goes to operators and supervisors:** Payload Summary and Payload Optimisation Report by load unit, crew and truck; overload events flagged at source, not in a weekly report.
4. **Strut health is monitored,** with calibration drift alerts, so bad readings do not reach reports.

Payload spans three IMPACT modules: Load and Haul Performance (targets and loss), Operator Performance (loading feedback) and Equipment Health (strut and payload health).

## Who uses it, and what do they see?

| Who | What | When |
|---|---|---|
| Load unit operators and supervisors | Loading feedback, loads in range, bias | Shiftly |
| Planners and production engineers | Trends, dig block and loader pairing | Weekly |
| Maintenance | Overload tracking, strut diagnostics | Near live |

## Without MaxMine payload vs with it

| | Without | With |
|---|---|---|
| Measurement | Onboard system, weighbridge, periodic study | Every haul, continuously |
| Overloads | Found later or after failure | Flagged at source and tracked for maintenance |
| Targets | One number | By truck class and material |
| Data accuracy | Assumed | Strut health and payload agreement checked |
| Feedback | Occasional | Per load unit, crew and truck |

## What does it measure?

| Metric | Definition | Unit |
|---|---|---|
| Payload | Load carried per haul | tonnes |
| Fill factor | Payload as a percentage of target | % |
| Overload events | Hauls above the allowed band, tracked cumulatively | count |
| Loads in range | Share of loads within the target band | % |
| Strut health | Per-strut pressure and deflection, with calibration drift alerts | status |

The 10-10-20 rule is built in so exceptions are easy to enforce.

Tools: shift-level trending and operator benchmarking; exception workflows; dig block and loader pairing; targets per truck class and material.

## What is closing the payload gap worth?

> **Extra tonnes a year = extra tonnes per load × loads a year**

Karara's published figures as the worked example (illustrative for your site):

| Step | Value |
|---|---|
| Extra tonnes per load | 3 |
| Loads a month | about 17,000 |
| Loads a year | about 204,000 |
| **Extra tonnes a year** | **about 612,000** |

Use your own loads and your measured gain. Dollars follow from your margin per tonne, or from the trucks the same tonnes would otherwise need.

## Results at operating mines

Each result below happened while the site used MaxMine, and MaxMine contributed alongside the site's own changes. Sites are described by commodity, mining method and country only, and each caveat stays with its result.

| Descriptor | Result | Window | Caveat |
|---|---|---|---|
| NRW Mining at the Karara Iron Ore project | Fill factor up about 3 t a load, about 612,000 t a year; overall score 76% to 96% | Not stated in the case study | As reported in the MaxMine case study |
| An Australian contractor-run coking coal mine | Underloaded trips (under 90% of target) 48.8% to 23.6% (-52%); about 31,200 fewer truck trips a year | Jul to Dec 2025 vs May to Oct 2026 | One truck model; the before window is a low point |
| An Australian open-cut metallurgical coal mine | Underloaded trips 28.8% to 13.3% (-54%); about 10,100 fewer trips a year | Oct 2023 to Mar 2024 vs Feb to Jul 2026 | One truck model |
| An Australian contractor-run gold mine | Average payload 211 to 235 t against a 227 t target (+11.6%); +9.8% on the full-year 2019 baseline; held above target for more than three years | Jan to Jun 2019 vs the six months to Mar 2025 | Long period, other changes possible |
| An open-pit mine (site not named) | Average payload 203 to 215 to 223 t against a 227 t target (+10%); loads under target 76% to 52% | 14 months | None stated |
| A large Australian open-pit gold mine | Payload +3.9%, sustained for 13 months; overload rate -86% | Manned-fleet era (before autonomy) | Older result |

Published case studies, as reported in each case study:

| Case | Result | Basis |
|---|---|---|
| [Gold mine payload optimisation](/case-studies/optimizing-payloads.md) | Variation cut, then targets raised | Western Australian gold mine |

Limits: MaxMine contributed; crews, load unit operators and targets changed too, and the Karara period is not stated.

## What does it need on site, and how does it fit with an existing FMS?

CORE on haul trucks and load units; no external infrastructure and no downtime for studies. Payload is MaxMine's own measurement, so it can be compared with the FMS or the truck's onboard reading.

## Frequently asked questions

**Does MaxMine replace weighbridges and payload studies?** It measures every haul continuously, so routine measurement does not need a study program.

**Why check strut health?** Worn or miscalibrated struts corrupt readings. MaxMine monitors them and flags degraded trucks.

**Can targets differ by truck and material?** Yes.

**Does it integrate with maintenance?** Strut diagnostics integrate with the site's maintenance management system.

**How accurate is the payload?** It is checked against the truck's own system in Equipment Health.

**Do we have to underload to avoid overloads?** No. The aim is to narrow the spread around target, then raise the target.

**How quickly does payload move?** One open-pit mine shows 203 to 215 t in 3 months and 223 t at 14 months.

## Related

- [Load and Haul Performance](/solution/load-and-haul-performance.md) | [Equipment Health](/solution/equipment-health.md) | [Operator Performance](/solution/operation-behaviour.md) | [IMPACT](/solution/impact.md)
- Guides: [haul truck payload](/guides/haul-truck-payload.md), [fleet data sources](/guides/fleet-data-sources.md), [haul truck queue time](/guides/haul-truck-queue-time.md), [all guides](/guides/index.md)

## Contact

https://maxmine.com.au/contact/

*Updated 4 November 2026 by.*