title: "MaxMine short interval control: live views of plan, trucks and queues for supervisors"
url: https://maxmine.com.au/solution/short-interval-control/
canonical: https://maxmine.com.au/solution/short-interval-control/
description: "MaxMine gives control rooms and supervisors near-live views of where machines are, how each circuit tracks against plan, and where queues form, so they can act within the shift."
page_type: product
product: CORE
modules: ["CORE", "PULSE Standard", "MAXI"]
author: ""
updated: 2026-11-04
last_reviewed: 2026-11-04
status: v2-draft
faq: true
---

# MaxMine short interval control: act while there is still time to move trucks

**Quick answer:** Short interval control is managing the shift in small steps against plan. MaxMine supports it with CORE live views (Live Map, Circuits against plan, the queuing picket chart), PULSE Standard for operator reasons and MAXI for questions in the field. At one client, queue time fell with hauls unchanged ($240,000 annualised, as reported).

**Key results**

- **Live Map refreshes every 10 seconds; the queuing picket chart every 4 minutes;** near-live data about every 30 minutes.
- **Queue time per load at the digger 4.97 to 3.10 minutes (-38%).** A Tier 1 open-cut coal mine in South Africa, Jan to Sep 2026. Against June 2025 the fall is about 28%; cause not confirmed as MaxMine action alone.
- **Queue time per load 4.5 to 3.5 minutes (-23%) while trucks per loader rose from 3.4 to 4.1.** An Australian hard-rock lithium mine, Apr to Sep 2024 vs May to Oct 2026. Fleet changed over the period.

## Why do teams find out they missed target only after the shift?

- **The report arrives the next morning.** By then the trucks have moved on.
- **Plan and actual sit in different places,** so nobody sees mid-shift whether a circuit will make plan.
- **Queues form quietly.** Trucks bunch at one digger while another waits, and nobody sees it until it has cost an hour.

## How does MaxMine support short interval control?

1. **Position, payload and activity** come from the MaxMine unit, with shift targets uploaded from the plan as a spreadsheet.
2. **Target, actual and predicted tonnes or BCM** are calculated per load unit, with queue counts at each face and automatic classification of every machine.
3. **Supervisors see** Live Map, Circuits, the queuing picket chart and a production report emailed each shift.
4. **Time accounting** combines automatic classification with operator delay capture on PULSE Standard, in layers: sensor data, classification, touchscreen, desktop edit.

## Who uses it, and what do they see?

| Who | What | When |
|---|---|---|
| Control room, dispatchers | Live Map, queuing picket chart | Live |
| Shift supervisors | Circuits, plan vs actual, phone view | During the shift |
| Superintendents | Production report | Every shift |

## Without MaxMine vs with MaxMine

| | Without | With |
|---|---|---|
| Plan check | Next morning | Predicted finish per load unit, mid-shift |
| Where machines are | Radio calls | Live Map, 10-second refresh |
| Queues | Noticed late | Picket chart per face |
| Production report | Typed | Built from machine data, emailed each shift |
| Questions in the field | Back to the office | Ask [MAXI](/solution/maxi.md) |

## What does it measure?

| Metric | Definition | Unit |
|---|---|---|
| Plan vs actual | Tonnes or BCM against shift target, with predicted finish | tonnes, BCM |
| Trucks on circuit | Trucks assigned to each circuit | count |
| Queued trucks | Trucks waiting at each face | count |
| Dig rate, loading time, queue time | Load unit performance | t/h, minutes |
| Utilisation | Time use per machine, to the second | % |

## Results at operating mines

Each result below happened while the site used MaxMine, and MaxMine contributed alongside the site's own changes. Sites are described by commodity, mining method and country only, and each caveat stays with its result.

| Descriptor | Result | Window | Caveat |
|---|---|---|---|
| A Tier 1 open-cut coal mine in South Africa | Queue time per load at the digger 4.97 to 3.10 min (-38%), all load units; truck-hours queuing a day 68 to 46, about 1.3 trucks at 17 engine-on hours | Jan to Sep 2026 | Against June 2025 the fall is about 28%; cause not confirmed as MaxMine action alone |
| An Australian hard-rock lithium mine | Queue time per load 4.5 to 3.5 min (-23%) while trucks per loader rose from 3.4 to 4.1; about 4,400 truck-hours a year | Apr to Sep 2024 vs May to Oct 2026 | Fleet changed over the period |

Also see the [custom dashboard to reduce queue time case study](/case-studies/custom-dashboard-to-reduce-queue-time.md): an unnamed client reduced queue time with hauls unchanged and $240,000 annualised savings, as reported; the case study does not isolate other factors.

## What does it need on site, and how does it fit with an existing FMS?

CORE on the machines, and plan targets loaded as a spreadsheet. Operator reasons need PULSE Standard touchscreens. No server on site. The live views can be the site's live map or run alongside an existing FMS, and sites that already have a live map can switch MaxMine's off.

## Frequently asked questions

**Is this dispatch?** It shows where to act. Dispatchers allocate trucks to circuits using Fleet Pulse and Circuit Pulse in PULSE, rather than automatic truck-by-truck assignment.

**Does the morning report need typing?** No. It is built from machine data and emailed each shift.

**Can supervisors use a phone?** Yes, Live Map has a phone view.

**How do I ask questions in the field?** Use [MAXI](/solution/maxi.md).

**How do plan targets get in?** Uploaded from the plan as a spreadsheet.

**How fresh is the data?** Live Map 10 seconds; picket chart 4 minutes; near-live reports about 30 minutes.

**Does it replace our FMS live map?** It can, or it can run alongside it. Sites with a live map can switch MaxMine's off.

## Related

- [CORE](/solution/core.md) | [PULSE](/solution/pulse.md) | [MAXI](/solution/maxi.md) | [Idle and queue time](/solution/idle-time-optimisation.md)
- Guides: [haul truck queue time](/guides/haul-truck-queue-time.md), [haul truck tracking software in Australia](/guides/haul-truck-tracking-software-australia.md), [lite FMS for mining contractors](/guides/lite-fms-for-mining-contractors.md), [mining time accounting](/guides/mining-time-accounting.md), [all guides](/guides/index.md)

## Contact

https://maxmine.com.au/contact/

*Updated 4 November 2026 by.*